Figure 5. The hydrophone vertical array. Left: The surface part of the array visible above sea level. The array was towed by the HUS workboat into position and moored to the bottom with heavy weights. Right: figure of how it looks when deployed. The figure shows 3 hydrophones at different depths, but in the current setting only two were used and the array was not drifting but fixed at one position.