Figure 2 . Location of the wind turbines in relation to the oil platforms on Gullfaks and Snorre. (Map re-used from Equinor 2019 Hywind Tampen PL050 – PL057 – PL089 PUD del II – Konsekvensutredning). Turbines HY02 – HY05 were not in place during the cruise.