Gå til hovedinnhold

Figur

Figure 6 . Soak time, as time from setting to hauling, at the different locations (4 = closest and 8 = furthest from the planned location of the wind farm). Colour of points indicates date of hauling.
Figur file_html_381ce704719fd0f8.png