Gå til hovedinnhold
Havforskningsinstituttet
HI
English
<- Tilbake
Søk
Søk
Søk
View page in English
Figur
Fra rapporten:
Fisheries survey in the offshore wind power field Hywind Tampen before development
Figure 4. Soak time, as time from setting to hauling, at the different locations (1 = closest and 8 = furthest from the planned location of the windfarm.